Home

About Us

Projects

Contact Us

Electrical

Mechanical

Tender Response

Project Management

Site Surveys

Brochure

News

Home

FAQ’s

Recruitment

Contact Us

© L Snape Electrical Ltd | All Rights Reserved | Terms and Conditions | Website Design by Chilli Creative

Contact Us
FAQ’s
Projects
About Us

Company

Services

Support

About Us Projects FAQ's Contact

01803 665418

Home Company Services FAQ's Projects Latest News Careers Contact Us
Dynamic Javascript Menu by Vista-Buttons.com v5.0.0
Projects

Marks and Spencer Simply Food Stores


We have completed a number of stores which consisted of project management and co-ordination with various trades to achieve practical completion on these tight programme dates, generally 7-8 weeks. The installations included lighting, power, security and fire alarm works.


Contract Value Approximately £50,000 each store

North Oxfordshire Academy


These works were the refurbishment of a school which consisted of several blocks. The works were a complete installation of lighting, power, security and fire alarm.


Contract Value £185,000

Job Centre Plus


Installation of electrical and mechanical services including security, CCTV and fire works.


Bargoed Contract Value £60,000

Merthyr Contract Value £70,000

Crown Plaza


A complete refurbishment of an existing hotel included all the bedrooms and seminar rooms, which comprised of; lighting (including feature lighting), power, rising busbar system and containment of other services.


Contract Value £300,000

Hines Meadow Maidenhead


This contract was a multi-story car park which was a new build with a new sub mains systems. The installation consisted of surface steel conduit and trunking. The majority of the works were lighting with some small mechanical power supplies. There was also a river of light system for the external feature lights. We also completed a new fire alarm system in MICC cable throughout the new and old car park.


Contract Value £270,000

Five Ways House Birmingham


A new fire alarm system installed on all floors and offices. These works were installed using surface trunkings and PVC conduit with FP200 gold cabling and MICC also to link the fire alarm panels together. All these works were completed out of hours.


Contract Value £90,000

Aldermaston


This contract was a M.O.D. Office block with a very high specification. All works had to be signed off by the AWE inspectors from the site. The works installed were an intelligent lighting control system with emergency monitoring. General purpose power and mechanical power which also included under raised floor works.


Contract Value £850,000